Firefox3/StatusMeetings/2006-06-07: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
No edit summary
Line 14: Line 14:
= 1.9/Gran Paradiso Schedule =
= 1.9/Gran Paradiso Schedule =
* [[Firefox3/Schedule|Preliminary schedule]]
* [[Firefox3/Schedule|Preliminary schedule]]
* Need development focus on regressions
* todo: need to figure out complete gecko 1.9 feature list
** vlad to consolidate all web pages related to gecko 1.9 into a single feature list
* mac needs 2 months before it can be ready for alpha
** 1 month until turn-on
** 2-3 weeks after that for bug shakeout
* major milestones
** mac cocoa widgets
** mac cairo
** 1-2 months
* parallel work before the "sync point"
** mac
** trunk regressions
** roughly start of August for the sync point
* dbaron: reflow needs 2 months of dedicated time
* can maybe do it in parallel, depending on dbaron's time; bz is helping; mats could help


= Developer Roundtable =
= Developer Roundtable =
Line 34: Line 55:


= Other Business =
= Other Business =
= Todo List =
- Feature list wiki consolidation: Vlad
- Feature/project list additions: everyone
- Triage 1.9a1 regression/blocker list
- Firefox 3 needs from Gecko 1.9

Revision as of 19:11, 7 June 2006

index | next week>>

Meeting Details

  • 11:00am PDT (18:00 UTC)
  • Mozilla HQ, 1st floor conference table
  • +1 866 216 2181 (or +1 303 228 0514)
  • join irc.mozilla.org #bonecho for backchannel

Agenda

  1. 1.9/Gran Paradiso Schedule
  2. Developer Roundtable
  3. Any other business

1.9/Gran Paradiso Schedule

  • Need development focus on regressions
  • todo: need to figure out complete gecko 1.9 feature list
    • vlad to consolidate all web pages related to gecko 1.9 into a single feature list
  • mac needs 2 months before it can be ready for alpha
    • 1 month until turn-on
    • 2-3 weeks after that for bug shakeout
  • major milestones
    • mac cocoa widgets
    • mac cairo
    • 1-2 months
  • parallel work before the "sync point"
    • mac
    • trunk regressions
    • roughly start of August for the sync point
  • dbaron: reflow needs 2 months of dedicated time
  • can maybe do it in parallel, depending on dbaron's time; bz is helping; mats could help

Developer Roundtable

  • High-visibility Gecko 1.9 features:
    • Cairo everywhere
    • Cocoa widgets on mac
    • Reflow branch
    • JS1.9
    • E4X4DOM
    • Language-agnostic DOM
    • XBL2
    • Event queue rework
    • Firefox on XULRunner
    • SVG improvements
  • Firefox 3 features:
    • Places
    • ???

Other Business

Todo List

- Feature list wiki consolidation: Vlad - Feature/project list additions: everyone - Triage 1.9a1 regression/blocker list - Firefox 3 needs from Gecko 1.9